Skip to content
Fort Lauderdale, FL · Licensed across FloridaMon–Fri 10:00 AM – 6:00 PM · (954) 807-3208
Romco Impact — Florida KeysCall

Florida Keys specifics · How We Work Here

Four Hours From Our Yard. Here Is How We Handle That.

We are based in Fort Lauderdale and the Keys are a long way down a single road. We work the county in planned blocks with crews lodged locally, and that has consequences worth stating up front.

Give us the mile marker and tell us whether the living floor is up on piers. Those two answers shape the job more than the window does.

Highest

Monroe carries the highest design wind speeds in Florida

Not HVHZ

And it is governed by statewide approval, not a Miami-Dade NOA

One road

Everything arrives down US-1. We plan the job around that

Licensed

A licensed Florida general contractor

A crew that has never seen the job it has been sent to

In this trade the person who quotes is frequently unconnected to the people who install. A figure gets signed, the work is handed to whoever has an opening in the calendar, and the owner spends the first morning explaining the job to strangers. Four hours from anywhere, with no supply house nearby, that gap between what was surveyed and what arrives on site stops being an inconvenience and starts costing weeks.

How a job runs with us

  • A booked survey at the property, at the level the work is happening.
  • True height above grade established before any pressure is calculated.
  • A specification in writing, with the approval identified opening by opening.
  • The corrosion package specified as standard rather than as an extra.
  • Everything ordered before we start, shaped units first.
  • Our own crews, lodged locally and working the job through.
  • The returns, the casing and the making good all stay on our side of the line.

Why the finishing stays in our scope

Most of this trade treats the window as the job and the stucco returns, the interior casing and the paint line as somebody else's problem. The owner ends up project-managing a stucco crew and a painter around a building that is finished on paper and clearly unfinished to look at.

That is a poor outcome anywhere and an unreasonable one at the end of an island chain, where finding a separate trade for a half-day of making good is genuinely difficult. Keeping it with us means we are the ones who come back if it is wrong.

How we handle it

  1. 01Do the survey and the specification up front, so our figure holds afterwards.
  2. 02Pull the permit with Monroe County or the municipality as required.
  3. 03Work in blocks so the building is never left dependent on a delivery.
  4. 04Commit to a date we believe, even when believing it means saying next month.

Lodging the crew is the part that makes this work. A team that drives down and back each day loses most of the day to the road and is never able to push through a difficult opening. A team that is here for the block starts early, works the job through, and is on site the morning after a delivery rather than three days later.

Said plainly

Where we stop

We do not fit shutters, we are not floodplain consultants, we do not do emergency board-up in Monroe County, and we cannot start next week. If any of those is what you actually need, knowing now saves us both a long drive.

FAQ

Common questions

Are you local to the Keys?
No. We are Fort Lauderdale based and work Monroe County in scheduled blocks with crews lodged locally. We would rather say that than claim an office we do not have. A local contractor will start sooner, and if speed matters most that is a fair reason to use one.
Does the distance cost me more?
It shapes the scheduling more than the price. What genuinely costs more here is the corrosion specification and the logistics of a single supply route, and we would rather explain that than hide it in a line item.
Do you work all the way to Key West?
Yes, throughout Monroe County. The further down the chain, the more the job depends on planning the supply and the block properly, which is the argument for booking well ahead.
Do you handle the permit?
Yes, as contractor of record with the right authority for the address. You are left holding the paperwork that a wind mitigation inspector will want to see.

Next step

Find out what is actually wrong with it.

An inspection, photographs of what we found, and a written scope. If the honest answer is that it can wait another season, that is the answer you will get.